330 MWe Power Plant At Meliti Achlada, Northern Greece
Of Public Power Corporation (P.P.C.) S.A.
The project concerns the construction of a 330 MWe lignite steam turbine power generation plant including the following building facilities: turbine house, bunker house, boiler house, ESP / auxiliary building, absorber and related building, FGD (fuel gas desulfurization) auxiliary building and preparation building, demineralization and chemical laboratories, crusher house, hydrogen production plant, row water storage and pump house, FGD electrical building, auxiliary boiler house, electrical building for ash handling, WWTP, electrical / chemical building, heating and chiller water building and cooling tower. The total area of the buildings is about 150.000 m2. |
Provided Services Detail design / engineering of the following electrical installations:
|
Project Budget: – |