Natural Gas Border Metering Station at the Greek / Turkish Border
of Public Gas Corporation of Greece (DEPA) S.A.
The project, partially funded under the European Union Community Support Framework III, comprises fiscal and custody transfer metering of gas exported from Turkey into National Gas Transmission System. The border station consists of filter / separators, metering system, control valves, station by pass, control system, ESD system and valves, fire protection system, security system, analyzers and flow control, instrument air system, nitrogen system, electricity supply, stand by generation, transformer, electrical switchgear, vent system. Building facilities of 1,800 m² total covered area, consisting of administration building, control station, workshop, warehouse, electrical substation and entrance guardhouse, as well as surrounding area infrastructure in a plot of 70,000 m2 total surface. Design pressure 80 barg, MAOP 75 barg, maximum design flow rate 11.6 bn m3/year (856,000 Nm3/h). |
Provided Services
|
Project Budget: € 11.0 million |