Power Integration Station 15.5 MWe at Revithoussa LNG Terminal
of Hellenic Gas Transmission System Operator (DESFA) S.A.
The Project concerns the construction of a Power Integration Station, which produces 15.5 MWe electric power covering the total power demands of Revithoussa LNG Terminal and 12.27 MWth thermal energy for the evaporation of the LNG. The Power Station comprises 2 x 6.72 MWe gas engine generator sets complete with their auxiliary equipment, heat recovery system, fuel gas metering & reducing station, compressed air system (with 34 Nm3/h- 30 barg Air Compressors for G.E. sets and 95 Nm3/h-8 barg Service Air Compressors), 22 m3 Lube Oil Storage Tank and forwarding system, 47 m3/s forced air radiator coolers, hot water system, service & make up pumping system (2 x 110 m¬¬¬3/h HT Cooling Water Pumps, 2 x 90 m3/h LT Cooling Water Pumps and 2 x 384 m3/h SCV water circulation pumps), station auxiliary transformers, MV/LV switchboards, DC system, DCS control system, communication and CCTV systems, electrical and control interlocks with the existing substation and control system of LNG Terminal and the National Electrical Transmission Grid, steel structures (2 x 30m steel stacks, 585 m2 steel structure buildings), concrete structures, HVAC and fire fighting systems, lighting/small power, grounding and lightning systems, drainage system, earthworks and various civil works. |
Provided Services
|
Project Budget: € 16.0 million Services Implementation Period: 2007 – 2009 |