Production Plant (Sarantis, Camel, Sanitas) And Finished Goods Warehouse At Inofita, Viotia
of Gr. Sarantis S.A.
The project concerns the construction of a production plant consisting of three production units, CAMEL (shoe polish), SANITAS – SANITAS (aluminum foil), SARANTIS COSMETICS, as well as office and administration facilities of 8,700 m2 total covered area and 11m height, a finished goods warehouse of 15,000 m2 covered area and 11m height, a supplementary production building for SANITAS of 552 m2, utility systems consisting of waste water treatment plant, pump-house for water supply/fire fighting, drivosol tanks, water supply tanks, alcohol tanks, hvac building, drilling pump-house, as well as surrounding area works (landscaping, U/G networks, paving) in a plot of 46,000 m2 total surface. The project includes also the relocation of the CAMEL existing production unit from Thivon Ave. to Inofyta, the relocation of SANITAS existing production unit from N. Kifisia to Inofyta and the relocation of SARANTIS COSMETICS existing production unit from 26 Amarousiou & Chalandriou Str. to Inofyta. |
Provided Services
|
Project Budget: € 13.2 million |