Megalopolis SES Engineering, Procurement, Transportation,
Installation and Putting in Operation a Combined Cycle Power Plant (Unit No 5), Natural Gas Fired, of Net Power 811 MW
of Public Power Corporation (PPC) S.A.
The Project refers to a natural gas fired Combined Cycle Power Plant that comprises two gas turbines, two Heat Recovery Steam Generators (HRSGs) and one steam turbine (2 + 2 + 1 configuration), one by-pass stack per gas turbine, with a water cooled condenser and a mechanical draft wet cooling tower for cooling the water.. The unit shall consist of the following buildings, structures, facilities, site improvements and area works. 1. Demolitions and Preparation Works
|
Provided Services Detail design / engineering for:
|
Project Budget: € 450 million Services Implementation Period: 2011 – 2014 |