White Tower Green Field Project Cigarette Manufacturing Plant at Aspropyrgos, Attica Of Papastratos S.A. (Philip Morris) The project concerns the construction of a cigarette manufacturing plant of 48,000 m2 total covered area and surrounding area works in a plot of...
Finished Goods Distribution Center at Schimatari, Viotia of Trade Logistics S.A. The project concerns the construction of an automatically operated warehouse of 34,000 m2 total covered area with provision for future expansion, of 11m height, with storage capacity of...
Substitution of Heavy Fuel Oil with N. Gas in Aluminium Plant, Ag. Nikolaos, Viotia of ALOUMINIUM S.A. The Project concerns the construction of natural gas pipelines and distribution network to all furnaces of Aluminium S.A. plant in Aghios Nikolaos, Viotia. It...
Water Bottling Plant, at Stymphalia of Natura Bottling S.A. The project concerns the construction of a water bottling plant of 4,840 m2 total covered area and surrounding area works in a plot of 23,500 m2 total surface. The plant consists of the structural steel...