BUILDINGS & INFRASTRUCTURE

Trade Logistics Distribution Centre

Hero Image

Finished Goods Distribution Center at Schimatari, Voiotia (GR).

OWNER
CLIENT
DATES
TRADE LOGISTICS S.A.
TRADE LOGISTICS S.A.
2006-2008

Brief Project Description

The Project concerned the construction of an automatically operated warehouse of 34.000 m² total covered area and a provision for expansion. The warehouse facilities connect to a railway network purposed for pallets and containers, being unloaded from 2.000 wagons per year. Loading / unloading and handling of goods is fully automated by remote control system of forklifts and conveyors. The project included surrounding area works (roads, paving, underground networks).

KEY PROJECT DATA

  • Total surface plot: 97.500 m².
  • Warehouse: 34.000 m².
  • Storage capacity: appr. 50.000 pallets.
  • Handling capacity: 4.500 pallets/day, 5.000 containers/year.

SCOPE OF WORK

  • Basic and Detailed Engineering Design.
  • Project Management.
  • Permitting.
  • Tendering.
  • Construction Management/SV.
  • Commissioning/Hand-over.