ENERGY TRANSITION

IGI - Poseidon Pipeline Onshore H₂ Ready

Hero Image

Front End Engineering & Design and Permitting for the Onshore Section of the Poseidon Pipeline Project.

OWNER
CLIENT
DATES
IGI POSEIDON S.A.
IGI POSEIDON S.A.
2017-2018

Brief Project Description

The Poseidon Pipeline Project overall length is 978 Km consisting of the Onshore Section (Kipoi-Florovouni/Thesprotia in Greece) and the Offshore Section (Florovouni-Otranto in Italy).

Initially the system is designed for a throughput of 15.45 BSCM/Y (Phase 1), with the possibility to be increased up to 20 BSCM/Y (Phase 2). During the first phase, 15.45 BSCM/Y of natural gas will enter the system near Kipoi, and an off-take is foreseen in Komotini. The flow rate from downstream Komotini to Otranto in Italy will be 12.29 BSCM/Y. During the second phase a maximum flow rate of 20 BSCM/Y is delivered at Otranto in Italy.

Project Owner is IGI Poseidon S.A., a 50-50% Joint Venture between DEPA International Projects S.A. and Edison S.p.A.

The pipeline and its components have been also designed for operation with up to 100% Hydrogen according to ASME B31.12.

Image courtesy of: IGI Poseidon S.A.

 

KEY PROJECT DATA

  • Pipeline length: 763 km appr. (48’’) / 8,2 km (36’’).
  • Pipeline diameter (Onshore): 48’’’/36’’.
  • Design Pressure: 100 barg (48″) – 170 barg (36″).
  • Capacity: 15.45-20 bcm/year.
  • 3 Compressor Stations (Phases 1,2).
  • 4 Metering Stations.
  • 3 O&M Bases.

SCOPE OF WORK

  • Front End Engineering Design.
  • Permitting.