ENERGY

TAP AG Trans Adriatic Pipeline Onshore

Hero Image

Detailed Engineering Design for the Onshore Section of the TAP Pipeline in Greece (Lots 2 & 3).

OWNER
CLIENT
DATES
TRANS ADRIATIC PIPELINE AG (TAP AG)
BONATTI J&P - Avax S.r.l.
2016-2017

Brief Project Description

The Trans Adriatic Pipeline (TAP) transports gas from the Shah Deniz II field in Azerbaijan via Greece and Albania and across the Adriatic Sea to southern Italy and further into Western Europe. The Trans Adriatic Pipeline starts near Kipoi on the border of Turkey and Greece, where it connects with the Trans Anatolian Pipeline (TANAP).  From there TAP continues onshore through the entire territory of Greece and Albania from east to west all the way to the Adriatic Sea coast.

Lots 2 & 3 cover the pipeline sections from Nea Karvali (GBV08) to the Greek – Albanian border.

Photos courtesy of: TAP AG.

KEY PROJECT DATA

  • Onshore Pipeline Diameter: 48“.
  • Pipeline Length (Lots 2&3): 364 km.
  • Design Pressure: 95 barg.
  • Fifteen (15) BVS.
  • Flow Capacity: 10 BCMY.

SCOPE OF WORK

  • Detailed Engineering Design.