ENERGY TRANSITION

ARIADNE Interconnection

Hero Image

Detail Design for the Stations of the ARIADNE Electrical Interconnection between Crete & Attica 2 x 500MW.

OWNER
CLIENT
DATES
ARIDNE INTERCONNECTION I INDEPENDENT POWER TRANSMISSION OPERATOR GROUP (IPTO GROUP)
TERNA S.A.
2020-2025

Brief Project Description

The Attica–Crete HVDC Interconnection (PCI) is a landmark energy project designed to secure Crete’s energy supply and enhance the stability of the Hellenic Power Transmission System (HPTS). It involves the construction of a High Voltage Direct Current (HVDC) link with a transmission capacity of 2 × 500 MW and a voltage of ±500 kV.

The interconnection includes:

  • HVDC Converter Station Koumoundouros (400 kV AC / 500 kV DC) in Attica.
  • HVDC Converter Station Damasta (150 kV AC / 500 kV DC) in Crete, with black start capability.
  • 150 kV GIS Substation at Damasta to connect with the local grid.

Photos courtesy of: ARIADNE Interconnection | IPTO.

KEY PROJECT DATA

  • Transmission capacity at 1.000 MW (2 x 500 MW).
  • Two submarine 500 kV cables.
  • Length: 335 km submarine HVDC cables.
  • Laid in sea depths of up to 1.200 meters.
  • Minimum visual & environmental nuisance.
  • Zero CO₂ emissions for energy production in Crete.

SCOPE OF WORK

  • Detailed Engineering Design.