DESFA Nea Messimvria-Evzoni/Gevgelija Pipeline H₂ Ready
Detailed Engineering, Procurement of Materials and Construction of the High-Pressure Pipeline Nea Mesimvria-Evzoni/Gevgelija.
Brief Project Description
The Project entails a High-Pressure Pipeline in Northern Greece for the supply of natural gas from the NNGTS to the Greek / North Macedonia border. The Project aims at providing diversification of routes and sources for natural gas to North Macedonia, through existing as well as future entry points of the NNGTS.
This HP Pipeline has a total length of approximately 54 km, starting from the existing O&M Station of Nea Messimvria, downstream to the existing Compressor Station, and terminating at the Interconnection Point near the Evzoni border crossing. This Pipeline will be part of the Greek National Natural Gas Transmission System (NNGTS).
KEY PROJECT DATA
- One 30’’ diameter Pipeline of appr. 54 km connecting North Macedonia’s Transmission System with the Greek National Natural Gas Transmission System (NNGTS) in Nea Mesimvria.
- One 30” Scraper Station (Launcher/Receiver) installed at the connection with NNGTS in the Nea Mesimvria O&M station.
- One 30” Launcher/Receiver Scraper Station installed upstream to the Border Metering Station, located inside the Border Metering Station area.
- One 28” Launcher/Receiver Scraper Station to serve the N. Macedonia Pipeline, installed downstream of the Border Metering Station, located inside the Border Metering Station area.
- One Border Metering Station located approximately 1 km from the Greece – N. Macedonia border line, in Greek territory.
- One Line Valve Station installed along the Pipeline routing.
SCOPE OF WORK
- Detailed Engineering Design.
- Permitting.
- Geotechnical I Geological I Topographical Studies.