Basic Engineering Design & EIA Study for the High-Pressure Pipeline to Patras, Greece.

OWNER
CLIENT
DATES
HELLENIC GAS TRANSMISSION SYSTEM OPERATOR (DESFA) S.A.
DESFA S.A.
2022-2023

Brief Project Description

The Project is an extension of the NNGTS via a pipeline of ~145 Km long in length and 20’’ in diameter, starts from the existing Line Valve Station in Megalopolis and ends at the Industrial Area of the City of Patras in the Peloponnese in Greece. The Project includes six (6) Line Valve and Scraper Stations.

The pipeline and its components have been designed for operation with up to 100% Hydrogen according to ASME B31.12.

KEY PROJECT DATA

  • Pipeline length : ~145 km.
  • Pipeline diameter : 20’’.
  • Design Pressure : 80barg.
  • Three (3) LVS and three (3) SS.

SCOPE OF WORK

  • Basic Engineering Design.
  • EIA Study.