HERON Energy Storage

Hero Image

HERON BESS 12 MW / 24 MWh & 150 MW / 900 MWh.

OWNER
CLIENT
DATES
SUSTAINABLE ENERGY SOLUTIONS S.A.
TERNA S.A.
2025

Brief Project Description

SUSTAINABLE ENERGY SOLUTIONS S.A. is proceeding with the construction of two (2) Battery Energy Storage Systems (BESS) in Theves, Boeotia in Central Greece.

a) A BESS at “HARAINTINI 1” location (Theves, Boeotia).

b) A BESS at “HARAINTINI 2” location (Theves, Boeotia).

Located in Boeotia in Central Greece, the BESSs shall be connected to the System via new MV Switchgears, new step-up transformers, the existing G.I.S. S/S of “HERON” and the existing overhead 150 kV transmission line “Panorama Dervenohorion P20 – Distomo HVC P80”, heavy duty (2B/150 kV) with “input – output” connection scheme.

Each BESS contains batteries of Li-ion technology.

KEY PROJECT DATA

  • BESS with a maximum injection power of 12 MW and a maximum absorption power of 13.5 MW, with a guaranteed (useful) capacity of 24 MWh (“HARAINTINI 1” location).
  • BESS with a maximum injection power of 150 MW implemented in three (3) stages, where the guaranteed (useful) capacity will be 150 MW 2 + 2 + 2 hours, respectively (“HARAINTINI 2” location).

SCOPE OF WORK

  • Detailed Engineering Design.