ENERGY
ICGB Interconnector Greece-Bulgaria
Detailed Engineering Design Activities relevant to the Greek Section of the Natural Gas Interconnector Greece-Bulgaria Project (IGB).
OWNER
CLIENT
DATES
ICGB AD (BULGARIAN ENERGY HOLDING EAD 50% - DEPA S.A. 25% - EDISON Spa 25%)
AVAX S.A. GENERAL CONTRACTORS
2020-2022
Brief Project Description
The natural gas interconnector Greece – Bulgaria (IGB) connects the natural gas transmission network of Greece and the Trans Adriatic Pipeline (TAP) near the town of Komotini with the Bulgarian transmission network near the town of Stara Zagora. The Interconnector has a technical capacity of 3 bcm/y with the potential for expansion of up to 5 bcm/y.
Photos courtesy of: ICGB AD.
KEY PROJECT DATA
- Pipeline Length: 182 km (total) – 32 km (Greek Section).
- Pipeline Diameter: 32“.
- Design Pressure: 80 barg.
- Gas Metering Stations Komotini.
- Design Pressure: 80 barg.
- Flow Capacity: 3-5 BCM/Y.
SCOPE OF WORK
- Detailed Engineering Design.