BUILDINGS & INFRASTRUCTURE

Papastratos Manufacturing Plant

Hero Image

White Tower Green Field Project Cigarette Manufacturing Plant at Aspropyrgos, Attica.

OWNER
CLIENT
DATES
PAPASTRATOS S.A. (PHILIP MORRIS)
PAPASTRATOS S.A. (PHILIP MORRIS)
2004-2008

Brief Project Description

The project concerned the construction of a cigarette manufacturing plant and surrounding area at Aspropyrgos in Attica, as well as the relocation of the manufacturing facilities of PAPASTRATOS S.A. to this industrial complex.

The plant consists of tobacco receiving and buffer storage areas, tobacco processing area, non-tobacco materials and finished goods receiving/shipping and buffer storage areas, cigarette manufacturing area, auxiliary production facilities, administration, flammable liquids store, technical facilities such as steam boilers, chillers, water pumps, fire water reservoir, fuel tanks, transformers, emergency generator, print shop, gate house, wastewater treatment plant.

Surrounding area includes parking, roads, drainage & lighting system, landscaping.

Photos courtesy of: Papastratos S.A.

KEY PROJECT DATA

  • Total plot surface: 217.000 m².
  • Manufacturing Plant: 48.000 m².
  • Processing area (primary): 7.125 m².
  • Manufacturing area (secondary): 7.300 m².
  • Auxiliary production facilities: 9.400 m².
  • Administration facilities: 8.600 m².
  • One-storey building: 6.000 m².

SCOPE OF WORK

  • Basic & Detailed Engineering Design.
  • Permitting.
  • Construction Tendering.
  • Construction Supervision.