ENERGY

TAP AG Compressor Stations Expansion

Hero Image

TAP Expansion - Early Works (Cold Cuts & Hot Tap Tie-ins), Basic & Detailed Engineering Design & Permit Engineering Services for the Kipoi Compressor Station GCS00 in Greece.

OWNER
CLIENT
DATES
TRANS ADRIATIC PIPELINE AG (TAP AG)
TRANS ADRIATIC PIPELINE AG (TAP AG)
2022-2025

Brief Project Description

The Trans Adriatic Pipeline (TAP) transports gas from the Shah Deniz II field in Azerbaijan via Greece and Albania and across the Adriatic Sea to southern Italy and further into Western Europe. TAP AG is responsible for the development and operation of the  gas transportation infrastructure from the Greece/Turkey border to Southern Italy.

The TAP pipeline has a transport capacity of 10 BCMY. The Project Owner has worked for expanding this capacity by various increments up to a maximum of 20 BCMY.

This project involves enhancing the Compressor Station GCS00 with a “full expansion case” and the installation of three (3) additional compressor units (15 MW/each), which equally require the station equipments’ upgrade.

Photo courtesy of: TAP AG.

KEY PROJECT DATA

  • TAP Pipeline transport capacity of 10 BCMY, considered to be expanded by various increments up to 20 BCMY.
  • Three (3) additional Compressor Units (15 MW/each).

SCOPE OF WORK

  • Basic Engineering Design.
  • Permit Engineering.
  • Detailed Engineering.