ENERGY
TAP AG Trans Adriatic Pipeline West Section
Local Pipeline Engineering Services for the Trans Adriatic Pipeline (TAP) - Greece West Section (Thessaloniki - Greek /Albanian Border).
OWNER
CLIENT
DATES
TRANS ADRIATIC PIPELINE AG (TAP AG)
UNIPER TECHNOLOGIES GmbH (former E.ON NEW BUILD & TECHNOLOGY GmbH)
2012-2014
Brief Project Description
The Trans Adriatic Pipeline (TAP) transports gas from the Shah Deniz II field in Azerbaijan via Greece and Albania and across the Adriatic Sea to southern Italy and further into Western Europe. The Trans Adriatic Pipeline starts near Kipoi on the border of Turkey and Greece, where it connects with the Trans Anatolian Pipeline (TANAP). From there TAP continues onshore through the entire territory of Greece and Albania from east to west all the way to the Adriatic Sea coast.
Photo courtesy of: TAP AG.
KEY PROJECT DATA
- Pipeline Diameter: 48“.
- Pipeline Length: 184 km.
- Design Pressure: 95 barg.
- Nine (9) Block Valve Stations.
SCOPE OF WORK
- Local Pipeline Engineering Services.