PPC Amyntaio Solar PV Plant

Hero Image

EPC Contract Project “Oricheio Dei Amyntaio” Amyntaio Cluster 3 Amyntaio Solar Park.

OWNER
CLIENT
DATES
NINE SINGLE MEMBER S.A. (R.W.E.)
TERNA S.A.
2025

Brief Project Description

The Solar PV Plant is part of nine (9) solar photovoltaic parks each under a single SPV (Solar Photovoltaic Technology), located in Northern Greece.

The Solar PV Plant is located above the mining facilities of the Greek Public Power Corporation (PPC) on excavated / backfilled ground. The solar photovoltaic installation will use either a fixed tilting suspension system or double-sided monocrystalline photovoltaic modules with a nominal power class of 585-590 Wp (+/- 5Wp).

The Project also includes the design and construction of underground MV (Medium Voltage) interconnection networks, design and construction of a new 150/33 kV HV interconnection substation and design and construction of all required interconnection works at two existing high voltage substations, one at 150/33 kV voltage levels and another at 400/33 Kv voltage levels.

Photos courtesy of: TERNA S.A.

 

KEY PROJECT DATA

  • Power Plant Capacity: 449MWp.
  • Location : 9 km SW of the town of Amyntaio,
    Prefecture of Florina and Kozani, region of W. Macedonia.

SCOPE OF WORK

  • Detailed Design in Electrical and I&C Engineering.