ENERGY TRANSITION

PPC Megalopolis Solar PV Plant

Hero Image

Engineering, Procurement (except from PV Panels), Transportation, Installation and Operation of the 125MW part of the PV Plant at Megalopolis Mines (“Oricheio Megalopolis”- Section C).

OWNER
CLIENT
DATES
PUBLIC POWER CORPORATION RENEWABLES S.M.S.A.,
TERNA S.A.
2025 (ongoing)

Brief Project Description

The Project consists of a 125MWp PV Plant, part of a larger PV Plant (490MW). This part will be installed within the Megalopolis Lignite Mine Center (Orycheio Megalopolis) in the Peloponnese, together with all the necessary interconnection works with the System through a new outdoor type Substation (33/150kV-Neo Choremi) and the addition of two transformer bays.

KEY PROJECT DATA

  • Specific PV Plant Capacity: 125MWp.
  • Larger PV Plant’s total capacity: 490MW.
  • Location: Megalopolis Mines in Arkadia, Peloponnese, GR.

SCOPE OF WORK

  • Detailed Design in Electrical and I&C.
  • Civil-Structural & Architectural Engineering.