BUILDINGS & INFRASTRUCTURE
Trade Logistics Distribution Centre
Finished Goods Distribution Center at Schimatari, Voiotia (GR).
OWNER
CLIENT
DATES
TRADE LOGISTICS S.A.
TRADE LOGISTICS S.A.
2006-2008
Brief Project Description
The Project concerned the construction of an automatically operated warehouse of 34.000 m² total covered area and a provision for expansion. The warehouse facilities connect to a railway network purposed for pallets and containers, being unloaded from 2.000 wagons per year. Loading / unloading and handling of goods is fully automated by remote control system of forklifts and conveyors. The project included surrounding area works (roads, paving, underground networks).
KEY PROJECT DATA
- Total surface plot: 97.500 m².
- Warehouse: 34.000 m².
- Storage capacity: appr. 50.000 pallets.
- Handling capacity: 4.500 pallets/day, 5.000 containers/year.
SCOPE OF WORK
- Basic and Detailed Engineering Design.
- Project Management.
- Permitting.
- Tendering.
- Construction Management/SV.
- Commissioning/Hand-over.